During formation in the boiler, steam leaves behind impurities (TDS - total dissolved solids). If left these concentrate and cause damage to the boiler.

  • High TDS results in plant & production problems
  • Low TDS results in increased fuel & chemical treatment costs

Accurate blowdown methods are essential maintain your steam quality, contact our engineers for advice on the best methods for your business.

Information icon

Not all products are available in all markets.  Please choose your National Spirax Sarco Website or Contact Us for further information.

What do I do now?

Find further information on TDS Blowdown Controls in the sections below, or get in touch for further assistance.

Contact us for advice from our engineers

  • Help on sizing and selection
  • Arrange a visit
  • Answers & advice on products/applications
  • Obtaining quotes & placing orders
Arrow Top
 

Technical Information

Use our technical information sheets for a full technical specification of the product. They typically include:

  • Pressure/temperature limits
  • Materials
  • Sizes & connections
  • Dimensions & weights
  • Capacity charts
  • Ordering information
Title Reference Number Issue File Size
PDF M410 Orifice Plate Flowmeter and Carrier Assembly TI-P176-02 5 245 KB
PDF Orifice Plate Flowmeters Customer Data Sheet TI-P176-04 7 146 KB

Archive Technical Information

PDF BC1100 TDS Contoller TI-P403-46 4 281 KB
PDF BC3100 Controller TI-P403-33 5 347 KB
PDF BC3200 and BC3210 Blowdown Controllers TI-P403-52 4 326 KB
PDF BT1000 Boiler Blowdown Timer TI-P405-17 4 222 KB
PDF IBC2700 Integrated Boiler Controller TI-P402-123 4 352 KB
Arrow Top
 

Installation & Maintenance Instructions

Clear & accurate guidelines on installation & maintenance. They typically include:

  • General safety information
  • General product information
  • Installation
  • Commissioning
  • Operation
  • Maintenance
  • Spare parts
Title Reference Number Issue File Size
PDF M410 Orifice Plate and Carrier Assembly Supplementary Safety Information IM-P176-07 1 33 KB
PDF M410 Orifice Plate Assemblies IM-P176-05 3 168 KB

Archive Installation & Maintenance Instructions

PDF BC1100 TDS Controller IM-P403-47 8 271 KB
PDF BC3100 Controller IM-P403-35 8 597 KB
PDF BC3200 and BC3210 Blowdown Controllers IM-P403-53 11 657 KB
PDF BC3250 Blowdown Controller IM-P403-89 1 3.22 MB
PDF BT1000 Boiler Blowdown Timer IM-P405-18 5 351 KB
PDF BT1050 Boiler Blowdown Timer IM-P405-39 1 3.23 MB
PDF IBC2700 Integrated Boiler Controller IM-P402-122 3 1.2 MB
Arrow Top
 

CAD Drawings

CAD drawings enabling you to see exactly how the product is constructed. You can also drop these into your own schematics.

Arrow Top

Contact us for advice from our engineers

  • Help on sizing and selection
  • Arrange a visit
  • Answers & advice on products/applications
  • Obtaining quotes & placing orders